Product added to cart
- Home
- Tech Section
- Instructions
- UTV
- Polaris UTV
- RZR PRO XP - BIG MO FULL EXHAUST INSTALL
RZR PRO XP - BIG MO FULL EXHAUST INSTALL
Turbo and exhaust systems get extremely hot! Only perform work when vehicle and engine have cooled to room temperature.
IMPORTANT - Read the entire instructions before proceeding. If any of it does not make sense or is not in your skillset, please have an experienced technician perform the install.
Component list:
|
Tools required:
|
RZR PRO XP - BIG MO FULL EXHAUST INSTALL
Turbo and exhaust systems get extremely hot! Only perform work when vehicle and engine have cooled to room temperature.
1. Remove O2 sensor from the stock manifold pipe (14mm)
2. Remove the heat shield from the engine side of the manifold pipe to expose the bolts 10mm on the manifold pipe.
3. Remove stock plastic covering the muffler from the rear of the RZR (4x T40)
4. Remove bolts from the muffler side brackets on both sides (2x 10mm).
5. Remove the two stock springs on the muffler with a spring puller.
6. Remove the bolts attaching the muffler to the manifold pipe (3x 13mm)
7. Remove stock Muffler (Pulls right out)
8. Remove the stock heat shield behind the muffler (4x 10mm). Save 2 bolts with points on them for a new muffler.
9. Remove lower stock muffler bracket (2x 10mm).
10. Remove the manifold pipe from the turbo. Heat the bolts first to loosen them. Recommended using a ball and Allen to remove the bolts. (4x 6mm Allen).
11. Install new manifold pipe to the turbo (4x 6mm Allen Torque to 20 Ft/lbs.)
12. Install aluminum blocks with the stock muffler heatshield bolts that you saved (from step 2). The dowels go in the threaded hole and the bolt in the non-threaded hole. (Torque the bolts to 96 inch/lbs)
13. Install the muffler bolts with the rubber washer and whitewasher. Ensure the rubber washer is against the frame and the whitewasher is against the Bolt head Insert from the back of the original muffler rubber isolator block.
14. Install muffler finger tight.
15. Clamp pipe and muffler together with included clamp (7/16) torque to 55 inch/lbs.
16. Tighten up muffler bolts to 35 ft/lbs. torque
17. Reinstall stock heat shield (10mm) and O2 sensor (14mm).
Disclaimer
As defined by the Magnuson-Moss Warranty Act. Do not install any performance parts or services unless you have the technical ability to properly set-up the entire machine to compensate for the installation of those parts. References in most of our literature to “bolt-on-parts” only indicate the parts are removable from the machine. It is not meant to imply that the parts can be installed without additional modifications. The necessary work and expertise needed to install different product varies. Instructions, where provided, are given to assist in installation only; they are not a substitute for mechanical experience in setting up racing vehicles. References to performance gains, reliability, ease of installation, etc. are bases on our and outside customer’s experiences. This is not a guarantee of similar performance in every installation. While we sell proven products, in the end it’s up to the individual to make the most of the product. Bikeman Performance Plus is not responsible for any personal or property damages caused by this product
Categories
- Downloads (5)
-
Instructions
(39)
- Snowmobile (23)
- UTV (18)
- Tech (8)
- Dealers (3)
- Info (0)
Tags
install
snowmobile
engine
polaris
utv
exhaust
arctic cat
muffler
torque link
set up
can-am
x3
x3rr
tech
clutching
patriot 850
dealers
distributers
bully dog
ski-doo
ehxaust
rzr
e-tec 850
head kit
clutchning
applications
gt
data logger
softwear
download
f7
ecu
dynojet
power vision 3
bov
y pipe
intake
yamaha
gearing
studding